Home · Compliance · ISO 29001
ISO certification · ISO 29001Oil and gas

Keybridge prepares ISO 29001 certification in Iraq and Kurdistan.

Manage quality requirements for petroleum, petrochemical and natural-gas products and services. We confirm the scope and the buyer’s stated requirements before preparation starts.

ISO 29001 Petroleum, petrochemical and natural gas quality management

ISO 29001 at a glance

Published
2020. ISO 29001:2020 is the current edition. It replaced ISO/TS 29001:2010.
Structure
Annex SL high level structure. 10 clauses. It carries the ISO 9001:2015 requirements and adds the petroleum sector requirements inside clauses 4 to 10.
Certifiable
Yes. The company is certified for the products and services named in the scope. There is no certificate for a product or a person under this standard.
Certificate validity
Check the dates and current status of the issued certificate; continued validity depends on meeting the certification body’s conditions.
Surveillance
Follow-up audits check that the management system continues to meet requirements between certification decisions.
Audit planning
Sites, activities, workforce and complexity affect the audit plan; the certification body determines the required audit time.
What the scope covers
Only the sites and activities written into the scope. Anything left out of it is not covered.
What the certificate says
The company name, the standard, the scope and the dates the certificate runs.
Language of the system
We write the documentation in the language the company works in: Arabic, Kurdish or English.

What ISO 29001 is

ISO 29001:2020 is the quality management standard for companies that supply products and services to the petroleum, petrochemical and natural gas industry. It carries the ISO 9001:2015 requirements and adds sector requirements on design control, supplier and subcontractor qualification, inspection and test planning, traceability and records retention.

What the standard requires

  1. Clauses 1 to 3 cover scope, normative references and terms. Clauses 4 to 10 are the requirements an auditor checks, and the sector requirements sit inside them.
  2. Clause 4, context. List the parties that matter, state which products and services the certificate covers, and map the processes from enquiry to delivery.
  3. Clause 5, leadership. Management owns the system, signs the quality policy, and assigns responsibility for each process in writing.
  4. Clause 6, planning. Record the risks for each process, plan contingency for critical supply, and set quality objectives with numbers and dates.
  5. Clause 7, support. Competence records for welders, inspectors and machine operators, calibration of every measuring instrument, and control of documents and records with a defined retention period.
  6. Clause 8, design and supply. Control design where the company designs, review the order before accepting it, qualify suppliers and subcontractors on record, and control special processes such as welding, heat treatment, coating and NDT.
  7. Clause 8, inspection and traceability. Plan the inspection and test points, record the result at each one, keep traceability from the material certificate to the delivered item, and control the release of nonconforming product.
  8. Clause 9, performance evaluation. Measure the objectives, run internal audits on a plan, and hold a management review.
  9. Clause 10, improvement. Log every nonconformity, complaint and field failure, find the cause, correct it, and show the correction worked.

Who needs ISO 29001 in Iraq and Kurdistan

Oilfield equipment manufacturersConnect technical specifications, supplier quality and product traceability for oilfield use.
Fabrication and machining workshopsControl material identity, fabrication processes and changes to technical specifications.
Drilling and well servicesManage service quality and continuity where equipment or execution failures affect operations.
Inspection and NDT companiesControl inspection-service quality while addressing technical competence separately.
Equipment traders and stockistsMaintain equipment identity, preservation and supporting supplier information.
Pipeline and facility contractorsCoordinate supplier quality and work-package conformity across project interfaces.
Chemical and lubricant suppliersControl batch identity, product specifications and conditions affecting supplied materials.

Buyer requirements

Buyer or listWhat they ask for
Kurdistan operatorsReview this buyer’s current supplier criteria for the products or services offered. Certificate scope, buyer acceptance and tender eligibility need to be checked separately.
Ministry of Natural Resources Approved Vendor ListCheck the current registration instructions for your activity and category. Confirm whether this standard is requested and which issuing bodies are accepted.
Basra operatorsReview this buyer’s current supplier criteria for the products or services offered. Certificate scope, buyer acceptance and tender eligibility need to be checked separately.
EPC contractorsReview the project’s supplier requirements and the work package you intend to deliver. A contractor may set requirements beyond the certificate itself.
API licensees and API aligned buyersReview this buyer’s current supplier criteria for the products or services offered. Certificate scope, buyer acceptance and tender eligibility need to be checked separately.
KRG Approved Suppliers CenterCheck the current registration instructions for your activity and category. Confirm whether this standard is requested and which issuing bodies are accepted.
Foreign buyers and lendersCheck the financing or procurement conditions for the relevant project. Confirm whether certification is requested rather than assuming it from the sector.

What shapes your investment

  • Number of sites and workshops, and whether the auditor has to travel to Erbil, Sulaymaniyah, Baghdad or Basra.
  • Headcount, which sets how many auditor days the audit takes before the oil and gas requirements add more.
  • Whether the company designs product or only supplies to a customer drawing.
  • Number of product families and special processes such as welding, heat treatment, coating and NDT.
  • How many suppliers and subcontractors have to be qualified and kept on record.
  • Languages the documentation is written in.
  • How much usable documentation already exists, including any API Spec Q1 work already done.
  • The date the documents are needed by.
  • Whether ISO 29001 is built alone or together with ISO 14001 and ISO 45001 as one system; the certification body determines the audit time.

The proposal names the scope, the deliverables and the dates before work starts.